Marknadens största urval
Snabb leverans

Planning for a project using GERT

Om Planning for a project using GERT

GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.

Visa mer
  • Språk:
  • Engelska
  • ISBN:
  • 9786206157960
  • Format:
  • Häftad
  • Sidor:
  • 84
  • Utgiven:
  • 27. april 2023
  • Mått:
  • 150x6x220 mm.
  • Vikt:
  • 143 g.
  Fri leverans
Leveranstid: 2-4 veckor
Förväntad leverans: 19. december 2024
Förlängd ångerrätt till 31. januari 2025

Beskrivning av Planning for a project using GERT

GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.

Användarnas betyg av Planning for a project using GERT



Hitta liknande böcker
Boken Planning for a project using GERT finns i följande kategorier:

Gör som tusentals andra bokälskare

Prenumerera på vårt nyhetsbrev för att få fantastiska erbjudanden och inspiration för din nästa läsning.