Marknadens största urval
Snabb leverans

Earned Schedule

Om Earned Schedule

This book is intended for those who use Earned Value Management (EVM), including project managers, engineers and performance analysts. Earned Schedule (ES) is a significant enhancement to EVM, extending its cost-based features to the management and control of schedule performance. By using ES and EVM together, project management of cost and schedule can now be treated in a truly integrated sense. The book builds from the fundamentals of EVM to derive the concept of ES. The performance measurement baseline and earned value from EVM are utilized to extract time-based performance measures, indicators, and predictors. From this foundation, complexity is incrementally added with descriptions and examples for performance analysis, prediction and project control. Specific features of ES useful to project management are included and illustrated for the following: forecasting of completion date, analysis of critical path, drill-down identification of process constraints, impediments, and areas of concern for rework.

Visa mer
  • Språk:
  • Engelska
  • ISBN:
  • 9780557177387
  • Format:
  • Häftad
  • Sidor:
  • 202
  • Utgiven:
  • 21. december 2009
  • Mått:
  • 153x225x14 mm.
  • Vikt:
  • 306 g.
  Fri leverans
Leveranstid: 2-4 veckor
Förväntad leverans: 24. september 2025

Beskrivning av Earned Schedule

This book is intended for those who use Earned Value Management (EVM), including project managers, engineers and performance analysts. Earned Schedule (ES) is a significant enhancement to EVM, extending its cost-based features to the management and control of schedule performance. By using ES and EVM together, project management of cost and schedule can now be treated in a truly integrated sense.
The book builds from the fundamentals of EVM to derive the concept of ES. The performance measurement baseline and earned value from EVM are utilized to extract time-based performance measures, indicators, and predictors. From this foundation, complexity is incrementally added with descriptions and examples for performance analysis, prediction and project control. Specific features of ES useful to project management are included and illustrated for the following: forecasting of completion date, analysis of critical path, drill-down identification of process constraints, impediments, and areas of concern for rework.

Användarnas betyg av Earned Schedule



Hitta liknande böcker
Boken Earned Schedule finns i följande kategorier:

Gör som tusentals andra bokälskare

Prenumerera på vårt nyhetsbrev för att få fantastiska erbjudanden och inspiration för din nästa läsning.