Marknadens största urval
Snabb leverans

Construction Scheduling, Cost Optimization and Management

Om Construction Scheduling, Cost Optimization and Management

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Visa mer
  • Språk:
  • Engelska
  • ISBN:
  • 9780415244176
  • Format:
  • Inbunden
  • Sidor:
  • 338
  • Utgiven:
  • 25. januari 2001
  • Mått:
  • 156x234x25 mm.
  • Vikt:
  • 703 g.
Leveranstid: 2-4 veckor
Förväntad leverans: 15. september 2025

Beskrivning av Construction Scheduling, Cost Optimization and Management

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Användarnas betyg av Construction Scheduling, Cost Optimization and Management



Hitta liknande böcker
Boken Construction Scheduling, Cost Optimization and Management finns i följande kategorier:

Gör som tusentals andra bokälskare

Prenumerera på vårt nyhetsbrev för att få fantastiska erbjudanden och inspiration för din nästa läsning.